|

We currently hold over five million tonnes
of resource and supply some 150,000 tonnes per annum. Our main
facilities are based at Caplich by Alness and at Dornoch Bridge
by Dornoch with further due to come on-stream. Over the years,
we have supplied approximately five million tonnes of aggregates
for construction projects in the Highlands. Other key elements
of our service include:
Modern mobile processing equipment designed
to limit environmental impact
A large fleet of modern and reliable delivery vehicles.
Strict quality control procedures to ensure highest standards
of aggregates
Experience in all aspects of construction to assist with
understanding clients issues.
Continuity of personnel and a high level of customer care.
Ability to bag aggregates to suit clients requirements.
Recognition to ISO 9002.
|
 |

We supply many thousands of tonnes of high
specification materials each year, to the Highland Council for
surface dressing of roads throughout the Highlands. In addition,
many thousands of tonnes have also been supplied as the foundation
for the construction of the entire roads network throughout the
Highlands, from the main A9 trunk roads to the small single track
remote highland roads vital to the Highlands.
We supplied specialist aggregates for use in
the production of lightweight concrete which was used by Taylor
Woodrow to construct a concrete flotation oil facility. Also supplied
Barmac with materials for the construction of specialised oil
rig fabrication facility.
Many tonnes of bedding materials have been
supplied to utility clients such as British Gas, Hydro Electric
and North of Scotland Water Authority to protect the utilities
laid throughout the Highlands.
|
 |

Materials Estimator:
Ray
Smith
Technical Specifications:
Mike
Donnachie
Production Control:
Patrick
Munro
|